After Sales Services

1After Sales Services
HV-MV Current Transformer Repair, Maintenance and Tests
HV-MV Voltage Transformer Repair, Maintenance and Tests
HV-MV Circuit Breaker Repair, Maintenance and Tests
HV-MV Disconnector Repair and Maintenance and Tests
Transformer Repair Service, Maintenance and Tests
Transformer Self-Protection Test and Maintenance
Transformer Isolation Oil test and Treatment process
Transformer On-Load Tap Changer Repair and Maintenance Service (All Brands)
Compensation Pannel Repair and Maintenance
Up to 500kV, periodic and annual tests, maintenance, repairs, mounting and dismunting services for all primary and secondary equipment located in switchyards for all Hydroelectric power plants (HPP), windpower plant (WPP) and Solar energy Plants (SEP) are being performed by our EKAT Certified experts and experienced personnel certified to work under 500kV.
2REPAIR and MAINTENANCE TEST for CIRCUIT BREAKERS
a) Circuit Breaker measuring opening time
b) Circuit Breaker measuring closing time
c) Circuit Breaker isolation resistance tests
d) Circuit breaker point passes resistance measurement
3MAINTENANCE
a)Circuit Breaker remote system control
b)Engine Turn on-Turn off Bobin control
c)Oil change for oil type breakers
d)Breaker mechanical control
4DISCONNECTOR PERIODIC REPAIR MAINTENANCE AND TESTS
a) Disconnector points passes resistance tests
b) Disconnector points pressure testsi
c) Disconnector isolators isolation resistance tests, Disconnector points control and maintenance, movable mechanism dust removal, isolator control ve cleaning, machanism adjustments, bus bar connection cleaning and mechanical destruction repair and changing, ball-bearing, seal and snap ring changing, Repair service for disconnector to continious operation.
5TRANSFORMER OIL
Using for isolation and cooling in between windings and to avoid heat to the atmosphere. And also gives info about transfomers current conditions. Oil performance also effects transformer conditions. Test on transformer oil gives info about oil quality and transformer working performance in order to take precaution. Ideal transformer oil should be resisted up to 60kV voltage level. Power transformer windings and current voltage carrying parts should be resisted against to rated voltageand frequency permanently and also should be resisted against to over voltage impulse for a limited time.
6KESİCİLER
7AYIRICILAR